at Cedar Point

Top Thrill 2 Construction Timeline

Cedar Point Historical Photos Taken: 10/29/2023 Posted: 03/30/2024

In this photo update, we share a collection of Top Thrill 2 photos showcasing the construction progress throughout the 2023 season. From mysterious footers in the Iron Dragon lagoon, to track installation, repainting and vertical construction, we share how this ride got reimagined.

For photos of the completed 420 foot spike, check out our Winter Chill Out 2024 photo update.




Vejas

Vejas

Hello, I created Theme Park Archive. I enjoy sharing photos, videos and stories from my theme park adventures with others.




We watch the tilt track for Siren's Curse get installed

We watch the tilt track for Siren's Curse get installed

Photo Updates Cedar Point 43 Photos Posted: 02/04/2025

Top Thrill 2 World Premiere

Top Thrill 2 World Premiere

Photo Updates Cedar Point 179 Photos Posted: 04/25/2024

Cedar Point Winter Chill Out 2021

Cedar Point Winter Chill Out 2021

Photo Updates Cedar Point 455 Photos Posted: 02/21/2021